FAMILLE RAILWORKS:
In this $230 million subcontract, RailWorks upgraded two interlockings and installed communication-based train control (CBTC), power and communications systems on the existing, 9.4-mile Flushing Line from Times Square in Manhattan eastward to Main Street in Flushing, Queens.
L.K. Comstock installied communications-based train control (CBTC) technology integrated on the line with existing interlocking control systems. Crews rehabilitated the Times Square interlocking with standard signal interlocking equipment and the First Avenue interlocking with new solid state interlocking control technology. The upgraded technology will provide better train throughput with less maintenance.
The project duration was 77 months.