RailWorks worked directly with Abengoa Bioenergy and design-builder FruCon-Austin to construct a double-loop track to service the new ethanol plant.
Once the conceptual design was prepared, RailWorks surveyed the proposed site and worked closely with the BNSF, the servicing railroad, to ensure the track specification met the approval of all parties involved. RailWorks constructed a 15,000-foot double-loop track with nine turnouts. The new track infrastructure accommodates two unit trains simultaneously to ensure continuous bioethanol production.