RailWorks rehabilitated and reconfigured the entire Alton Steel rail yard.
This $2 million, six-month project included removing the existing track and constructing a new yard, track turnouts and crossing. RailWorks dismantled and removed 21 turnouts and 3,300 track feet and was responsible for preparing the project site, including grading, sub-ballast and drainage. RailWorks crews installed 24 turnouts and constructed 3,800 track feet and a crossing.
RailWorks enhanced the track network in the rail yard by constructing another turnout and track exiting the facility to tie into the existing terminal loop track.